SEACON - Bennett Street/Airport Road Work

UPDATE # 7 SEACON Roadwork Update as of 6-21-2019

~~ Please see the Update Notice #7 below.....

____________________________________________________________________

 

UPDATE # 6  SEACON Roadwork Update as of 6-14-2019

Release Date 6/14/19

A Portion of Bennett St. will remain CLOSED in-between Second Avenue and Third Avenue until Saturday 6/15. There will be no Thru Traffic.

A Detour will be set up for access around the work zone; however, it still may be less delay to utilize Evergreen Ave. to access the Airport and Ishiyama Dr..

For Access to the Forestry Office, please utilize the detour through the Industrial Park from 2nd Ave. to 3rd Ave.

Beginning Sunday 6/15 there will be NO PARKING on Bennett St between Zimovia Hwy & Reid St.

For more information, please contact the project offices at:
SECON - 874-3145
DOT – 874-3141

Traveling public should expect short delays in all work areas.

Please pay attention to signs in the areas, and keep an eye out for flaggers, crew, and pedestrians when traveling through these areas. Thank you for your patience.

Sincerely,
Project Staff

______________________________________________________________________

UPDATE # 5 SEACON Roadwork Update as of 6-10-2019

A Portion of Bennett St. will be CLOSED in-between Second Avenue and Third Avenue. There will be no Thru Traffic from 7 AM to 7 PM beginning __6/12/2019____.

A Detour will Be set up for access around the work zone, however it still may be less delay to utilize Evergreen ave. to access the Airport and Ishiyama Rd.

For Access to the Forestry Office please utilize Detour Through the Industrial Park from Second Ave to Third Ave.

For information regarding this closure please contact the project offices at;
SECON - 874-3145
DOT – 874-3141

Traveling public should expect short delays in all work areas. Please pay attention to signs in the areas, and keep an eye out for flaggers, crew, and pedestrians when traveling through these areas.

Thank you for your patience.

Sincerely,
Project Staff

______________________________________________________________________

UPDATE # 4 SEACON Roadwork Update as of 6-7-2019

A Portion of Bennett St. will be CLOSED in-between Third Avenue and Ishiyama (Spur) Rd. There will be no Thru Traffic from 7 AM to 7 PM beginning __6/10/19____.

For Airport Access and Access to Ishiyama Rd. please utilize Evergreen Ave. from the Ferry Terminal side.

For Access to the Forestry Office please utilize Bennett St. from the Zimovia Hwy side.
For information regarding this closure please contact the project offices at:
SECON - 874-3145
DOT – 874-3141

Traveling public should expect short delays in all work areas. Please pay attention to signs in the areas, and keep an eye out for flaggers, crew, and pedestrians when traveling through these areas. Thank you for your patience.

Sincerely,
Project Staff

__________________________________________________________________________

UPDATE # 3 CORRECTED SEACON Roadwork Update as of 6-6-2019

Airport Road will be CLOSED in-between the East Airport Access Rd. and Ishiyama (Spur) Rd. There will be no Thru Traffic beginning 6/8/19.

For Airport Access please utilize Evergreen Ave. from the Ferry Terminal side.

For Access to the Ishiyama (Spur) Rd. please utilize Bennett St. from the Zimovia Hwy side.
For information regarding this closure, please contact the project offices at;​

SECON - 874-3145

DOT – 874-3141

Traveling public should expect short delays in all work areas. Please pay attention to signs in the areas, and keep an eye out for flaggers, crew, and pedestrians when traveling through these areas.

Thank you for your patience.

-------------------------------------------------------------------------------------------------------------------------

UPDATE #2 : Thursday, May 30, 2019: 

Roadwork to commence on Tuesday, 5/29. Crew’s will be working on new drainage culverts & storm sewer structures beginning on the Airport end of the Project and in driveway crossings along both sides of the road. The effected residents and businesses that may be affected will be contacted directly. There will be NO PARKING along the construction corridor on Bennett St beginning 5/30/2019; No Parking signs will be posted for some asphalt removal operations on Bennett St from Zimovia Hwy to 2nd Ave. Traveling public should expect short delays in work areas. Please pay attention to signs in the areas, and keep an eye out for flaggers, crew, and pedestrians when traveling through this area. Thank you for your patience.

Thank You,

SECON Project Staff

__________________________________________________________________________

UPDATE # 1

SECON will begin road work on Bennett Street and Airport Road beginning Tuesday May 20th.

Work will begin at the Airport Pit Access Road Continuing towards the Zimovia Hwy/ Bennett Street Intersection. Construction crews will be installing Construction Signs & New Culverts across and alongside the roadway. All residents and businesses that may be affected will be contacted directly.

NO PARKING will be allowed along Bennett St beginning 5/29/2019. Be aware of flagger operations and single lane traffic Monday through Saturday, between 7:00am and 5:00pm, and expect short delays. Be aware of possible sidewalk CLOSURES with pedestrian DETOUR routes.

Please keep an eye out for warning signs, flaggers, work crews, equipment, and pedestrians when traveling through this area. Thank you in advance for your patience, and we look forward to another safe construction project in Wrangell this summer.